1. Home
  2. SAP
  3. SAP Certified Associate
  4. C_TS422_2023 Exam Info

SAP C_TS422_2023 Exam Questions - Navigate Your Path to Success

The SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing (C_TS422_2023) exam is a good choice for SAP S/4HANA Manufacturing Consultant and if the candidate manages to pass SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing exam, he/she will earn SAP Certified Associate, SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Certifications. Below are some essential facts for SAP C_TS422_2023 exam candidates:

  • In actual SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing (C_TS422_2023) exam, a candidate can expect 80 Questions and the officially allowed time is expected to be around 180 Minutes.
  • TrendyCerts offers 80 Questions that are based on actual SAP C_TS422_2023 syllabus.
  • Our SAP C_TS422_2023 Exam Practice Questions were last updated on: Mar 02, 2025

Sample Questions for SAP C_TS422_2023 Exam Preparation

Question 1

What does a line hierarchy in repetitive manufacturing represent?

Correct : A

A line hierarchy in repetitive manufacturing represents the structure of a production line that consists of multiple work centers. A line hierarchy is a master data object that defines the sequence and the relationship of the work centers that are involved in producing a material. A line hierarchy can be split into different levels, such as line segments, processing stations, or takt areas, to reflect the complexity and the variability of the production line.A line hierarchy can be used for planning and scheduling operations, controlling material flow, and monitoring production performance12.

The other options are not correct for the following reasons:

A production line with prioritized work centers(B): This is not correct. A line hierarchy does not define the priority of the work centers, but the order and the dependency of the work centers. The priority of the work centers can be determined by other factors, such as the capacity availability, the production rate, or the scheduling parameters.

A production line with a parallel sequence in the routing: This is not correct. A line hierarchy does not represent the parallel sequence in the routing, but the linear sequence of the work centers. A parallel sequence in the routing means that two or more operations can be performed simultaneously on different work centers for the same material.A parallel sequence in the routing can be modeled by using alternative sequences or parallel sequences in the line hierarchy3.

A production line with an alternative sequence in the routing(D): This is not correct. A line hierarchy does not represent the alternative sequence in the routing, but the main sequence of the work centers. An alternative sequence in the routing means that there are different options for performing an operation on different work centers for the same material.An alternative sequence in the routing can be modeled by using alternative sequences or parallel sequences in the line hierarchy3.


https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/f899ce30af9044299d573ea30b533f1c/9231f9504a62eb5ee10000000a44538d.html

Options Selected by Other Users:
Question 2

How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 Correct answers to this question.

Correct : A, B, E

Increase the capacity supply in a time-phased interval: You can use the capacity planning table or the capacity planning board to increase the available capacity of a resource by changing the shift sequence, the shift duration, or the number of individual capacities. You can also use the capacity leveling function to distribute the capacity requirements over a longer time horizon. This way, you can avoid capacity overloads and create a balanced capacity load.

Determine a time period with available capacity on the planning board: You can use the planning board to visualize the capacity load and the capacity availability of a resource in a graphical Gantt chart. You can use the filter and zoom functions to focus on a specific time period and resource. You can also use the capacity evaluation function to display the capacity situation in a tabular or graphical form. This way, you can identify the time periods with available capacity and plan the operations accordingly.

Form optimum sequence to reduce setup times: You can use the setup matrix or the setup group key to define the setup times and the setup categories for a resource. You can also use the setup optimization function to determine the optimum sequence of operations that minimizes the total setup time. This way, you can reduce the capacity consumption and increase the throughput of the resource.Reference:Identifying the Basic Principles and Tools of Capacity Planning;SAP Help Portal; [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 82.


Options Selected by Other Users:
SAP C_TS422_2023